• API RP 95F:2007

API RP 95F:2007

Gulf of Mexico MODU Practices for the 2007 Hurricane Season - Interim Recommendations (WITHDRAWN - REPLACED BY APPENDIX K TO API 2SK)

American Petroleum Institute , 04/01/2007

Publisher: API

File Format: PDF

$70.00$140.00


This Recommended Practice supersedes RP 95F, First Edition, May 2006. RP 95 supplements API RP 2SK, RP 2I, and RP2SM for Gulf Of Mexico MODU mooring design, operation, inspection and maintenance practices during hurricane season. Topics addressed in RP 95F that will be part of the overall mooring design and MODU operations include:
  • Mooring Analysis
  • Mooring Design Criteria
  • Consequences of Failure
  • Indicative GOM hurricane extreme metocean conditions
  • Site-specific risk assessment and mitigation
  • Mooring hardware issues such as anchor system considerations and mooring system improvements
  • Mooring operation issues such as deployment, hurricane preparedness, and inspection

This RP was developed through a cooperative arrangement with the American Petroleum Institute's Subcommittee on Offshore Structures - RP 2SK Task Group, the API Executive Committee on Drilling and Production Operations, and the Joint Industry Project entitled "US Gulf of Mexico Mooring Strength Reliability" (MODU JIP).

API RP 95F:2007 History

API RP 2SK:2024

API RP 2SK:2024

$72.00 $144.00

API RP 95F:2007

API RP 95F:2007

$70.00 $140.00

API RP 95F:2006

API RP 95F:2006

$72.00 $144.00

API RP 2SK (R2015)

API RP 2SK (R2015)

$71.00 $142.00

More Standards PDF

API MPMS Chapter 12.4.1 First Edition
API Spec 5CT Eleventh Edition
API RP 500:2023

API RP 500:2023

$151.00 $302.00

API Std 688:2023

API Std 688:2023

$90.00 $180.00